Skip to main content

Private Canadian supplier Source-checked against official regulations Not a government agency

Call or text: 289-228-7021
Configure and check outfrom $79.99
Made to order

Media and production capability are confirmed before production. If a selected input is temporarily unavailable, it is treated as backordered and we contact you before work begins.

14 ordering options
Current CAD pricing
Proof before production
Ships Canada-wide
Product gallery
5 images
EV Charging Only sign, 12 by 18 inch aluminum, Ontario
Made to order

EV Charging Station Sign Ontario

Mark reserved EV charging stalls clearly at your commercial lot, condominium, or workplace with an Ontario EV charging sign built from the wording your site needs.

From
$79.99
Options
14 available
Reference
Proof first

Order this product

Choose your option and check out securely. Fleet or bulk? Request a quote below.

Order Intake
Parking Sign Order Intake

Enter the exact sign wording, site and placement details for the selected wording, size and package. The wording text is required only for the Custom wording option and a proof is produced before production.

Wording Template
Material
Wording Template: EV Charging Only | Material: Rigid Aluminum$79.99 CAD
Selected total$79.99 CAD

The intake above is saved with your order before checkout.

Proof Before Production

Your paid order starts the proof. Production begins only after you approve it.

Product details

Mark reserved EV charging stalls clearly at your commercial lot, condominium, or workplace with an Ontario EV charging sign built from the wording your site needs. Confirm the exact wording and any enforcement process with your municipality or property management before ordering.

Choose the sign for the job

The live templates cover EV Charging Only, Reserved for Electric Vehicle, timed charging windows (30 minutes, 1 hour, 4 hours), and Accessible EV Charging Only. A template communicates the property's charging-stall rule; it is not automatically a municipal enforcement-approved face. Fifteen additional wordings from the same production library — including "Vacate Stall When Charging Completed," "Charger Out of Service," and bilingual or time-restricted variations — are available through Custom wording.

What Ontario law says

The Reserved Parking for Electric Vehicle Charging Act, 2019 and Ontario Regulation 615 (Signs) under the Highway Traffic Act set the format for EV charging parking signs used in a municipally designated enforcement programme: a no-parking symbol, an EV charger symbol, and the words "EXCEPT WHILE CHARGING" (O. Reg. 615, s. 27.1(1)). Where a municipality has properly designated a space under that framework, a vehicle that is not plugged in and charging can be ticketed under section 30.2 of the Highway Traffic Act ($125). A privately purchased sign on a condominium or commercial lot does not, by itself, create that ticketing authority — confirm the applicable municipal by-law or your property's enforcement process before relying on it.

Read the government's own explainer: Charging your electric vehicle — Ontario.ca. See also R.R.O. 1990, Regulation 615 and the Highway Traffic Act.

Material & guarantee

Every sign is produced Made in Canada on rigid aluminum or premium reflective vinyl and is backed by a 7-Year outdoor guarantee against fading, cracking or peeling under normal weather exposure.

Choose your wording and finish

  • 12 x 18-inch panel — matches the existing production template library.
  • 0.063-inch aluminium panel with a rigid or reflective face.
  • Pre-drilled mounting holes for post or wall installation.

Before you order

  1. Identify whether the stall is on private property (condo, commercial lot, workplace) or part of a municipally designated on-street/public programme.
  2. Decide whether the wording is informational (property rule) or intended to support a municipal enforcement programme.
  3. Confirm the exact wording, symbol requirements and placement with the local municipality or condominium board when enforcement is intended.
  4. Select the live wording and finish that match the confirmed requirement, or choose Custom wording for one of the other production templates.

Use the dedicated sign for accessible EV stalls

An accessible EV charging stall needs both the EV charging designation and the applicable accessible-parking signage. Pair this sign with the AODA accessible parking sign where the stall is also a designated accessible space.

Need your own wording? Choose Custom wording

The Custom wording option opens the rest of the production library — 30-minute, 1-hour, 2-hour and 4-hour charging windows, "Vehicle Must Be Actively Charging," "Move Vehicle When Charging Complete," "Charger Out of Service," bilingual and time-restricted faces, or your own property-specific wording. Type the exact wording (or the template name) in the order intake; a proof is produced for your review before anything goes to production.

  • Fully custom layouts — your stall count, your hours, your rules
  • Bold, legible lettering engineered for outdoor readability at distance
  • Proof reviewed by you before production

Custom wording follows the same posting principle as the stock templates: a privately purchased sign communicates the charging-stall rule but does not create ticketing authority by itself outside a municipally designated programme. Confirm enforcement wording with the local municipality before ordering.

Order the EV charging sign your site actually needs

Choose the confirmed wording and finish above. For enforcement use, complete the municipal check before placing the order.

Last verified: August 4, 2026, against Ontario.ca and the e-Laws text of O. Reg. 615 and the Highway Traffic Act. Municipal by-laws and property rules vary — verify your specific requirement before ordering.

  • EV Charging Only, timed and accessible wording choices
  • Reg. 615 s.27.1(1) sign-format reference
  • 12 x 18-inch aluminium panel, rigid or reflective face
  • Custom wording opens 15+ additional production templates
  • Municipal enforcement limits stated before ordering
  • made to order in Canada, Ontario
Source review in progress

The answer in 20 seconds

EV Charging Station Sign Ontario can be ordered from the current options and CAD prices on this page. The required order details and proof decision travel with checkout.

Review required before production or reliance.

Source-checked authority

Product source and requirement record

SpecificationRequirementPrimary reference
Offer scopeThe page lists the exact orderable configurations and current CAD prices. It does not promise an inspection, approval, or legal outcome.Live product record
Customer informationRequired wording, identifiers, or artwork must be supplied through the displayed intake before checkout.Rendered order contract
Production controlA custom proof must be approved before production begins.Published workflow
Last verified Jul 20, 2026 against Live product configuration and page record.

Questions buyers ask

What do I need to order EV Charging Station Sign Ontario?

Choose a live product option and complete every required detail shown in the configurator. Checkout stays blocked until the required order information is present.

Is a proof included before production?

Yes. The submitted order details start the proof process, and production begins after the custom proof is approved.

How do I choose the right option?

Compare the live option labels, product images, authority or scope record, and ordering table on this page. If the required specification is not shown, request help before checkout instead of guessing.

Ordering comparison

DecisionThis product pageQuote-first ordering
Price and optionsCurrent CAD prices and orderable options are visible before checkout.Pricing and available configurations are confirmed after an enquiry.
Order informationRequired customer details are captured with the selected product before checkout.Specifications are commonly repeated across messages before an order is opened.
Production controlA custom proof must be approved before production begins.Approval and production steps depend on the individual quote workflow.

Customer reviews

This product does not have a published customer rating yet. We only publish ratings from real customer reviews. Use the source-checked specifications, product images, live options, and proof-before-production process to decide.

Complete the job

Related compliance products

Running more than one vehicle? Send us the list — we proof every unit before anything prints.

5 + vehiclesAnnual renewalProvince-wideCross-border USDOT